Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Minneapolis Procurement is soliciting sealed electronic bids for felt liner materials to support cured-in-place pipe (CIPP) lining work. Bids are due at 12:00 PM local time on January 13, 2026, and results will be posted on the City's website following opening. The solicitation concerns material supply for the City’s public works sewer lining program and is not a grant program.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Northampton, Massachusetts is soliciting sealed bids for cured-in-place pipe (CIPP) sewer lining services. The contract will rehabilitate existing sewer infrastructure using CIPP methods to reduce infiltration and extend service life. Bids are due to the City by the specified deadline on the COMMBUYS posting.
Posted Date
-
Due Date
Jan 28, 2026
Release: -
Close: Jan 28, 2026
The City of Northampton, Massachusetts is soliciting sealed bids for cured-in-place pipe (CIPP) sewer lining services. The contract will rehabilitate existing sewer infrastructure using CIPP methods to reduce infiltration and extend service life. Bids are due to the City by the specified deadline on the COMMBUYS posting.
AvailableWork includes sanitary rehabilitation services for cured-in-place pipe (CIPP) lining, cleaning, inspection, and rehabilitation of sanitary sewer pipes. The term of contract is for three years, for two additional one-year periods.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Work includes sanitary rehabilitation services for cured-in-place pipe (CIPP) lining, cleaning, inspection, and rehabilitation of sanitary sewer pipes. The term of contract is for three years, for two additional one-year periods.
AvailableThis solicitation requests vendors to provide cleaning, inspection, and cured-in-place pipe (CIPP) lining rehabilitation services for sanitary sewer pipes within JEA’s service territory. Responses must be submitted electronically through JEA’s Zycus E-Procurement portal and JEA will publicly open responses on the due date. The solicitation includes mandatory pre-response meeting information, minimum qualifications, insurance and bonding requirements, and indicates JEA may award multiple contracts.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
This solicitation requests vendors to provide cleaning, inspection, and cured-in-place pipe (CIPP) lining rehabilitation services for sanitary sewer pipes within JEA’s service territory. Responses must be submitted electronically through JEA’s Zycus E-Procurement portal and JEA will publicly open responses on the due date. The solicitation includes mandatory pre-response meeting information, minimum qualifications, insurance and bonding requirements, and indicates JEA may award multiple contracts.
Work includes sewer cured in place rehabilitation project shall include, but not be limited to, obtaining a encroachment permits from the city, providing traffic control, public notifications, cleaning of sewer lines prior to insertion of cured in place pipe resin impregnated flexible liner, cleaning of manholes prior to rehabilitation of the manhole by lining, inspection of pipelines via closed circuit television before and after liner pipe installation, bypassing manholes, bypass pumping and/or diversion of sewage flows, reconnecting service laterals and cleanup.
Posted Date
Dec 23, 2025
Due Date
Feb 6, 2026
Release: Dec 23, 2025
Close: Feb 6, 2026
Work includes sewer cured in place rehabilitation project shall include, but not be limited to, obtaining a encroachment permits from the city, providing traffic control, public notifications, cleaning of sewer lines prior to insertion of cured in place pipe resin impregnated flexible liner, cleaning of manholes prior to rehabilitation of the manhole by lining, inspection of pipelines via closed circuit television before and after liner pipe installation, bypassing manholes, bypass pumping and/or diversion of sewage flows, reconnecting service laterals and cleanup.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis