CountyNY
Posted
Aug 26, 2026
Sep 10, 2026
Rehabilitation and Reconstruction of CR626
Rehabilitation and reconstruction of cr626.
Description: Chautauqua County, New York, is soliciting bids under PW-8-26 DPF for the rehabilitation and reconstruction of CR626. The opportunity is an open invitation to bid for roadway rehabilitation, with bids due September 10, 2026, at 2:00 PM EDT. The public listing does not expose a downloadable primary solicitation file; the ITB documents are available through the County’s Purchasing Office.
County · NY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyNY
Posted
Aug 26, 2026
Sep 10, 2026
Rehabilitation and reconstruction of cr626.
CityGA
Posted
Sep 2, 2026
Oct 9, 2026
The City of South Fulton is soliciting proposals under RFP 26-38 from qualified and experienced contractors to rehabilitate and reconstruct four existing tennis courts at the South Fulton Tennis Center. The solicitation includes proposal instructions, schedule, minimum qualifications, site-visit information, evaluation criteria, required attachments, bonding and insurance requirements, a cost form, and general terms and conditions. This is a formal construction-services procurement—not a grant program—with proposals due October 9, 2026, at 2:00 PM Eastern Time.
CityTX
Posted
Aug 18, 2026
Sep 9, 2026
Work includes approx. of 1,709 LF of 6" PVC C-900, (DR 18) waterline by augered construction, all depths, complete in place; 1,435 LF of pipe bursting existing 6" sanitary sewer with 8.625" O.D, sanitary sewer, all depths, complete in place; 1,910 LF of 4" PVC C-900, (DR 18) waterline by augered construction, all depths, complete in place; 3,270 LF of 8" PVC C-900, (DR 18) waterline by augered construction, all depths, complete in place; 324 LF of high density polypropylene pipe (HDPP) (48"), all depths, including post TV inspection, complete in place; 2,976 LF of reinforced concrete pipe (24") (rubber gasket joints), all depths, including post TV inspection, complete in place.
CityMN
Posted
Aug 13, 2026
Sep 3, 2026
Work includes removing and reconstructing the existing retaining wall, grading and concrete sidewalk replacement. Approx 290 LF Remove retaining wall; 45 SY modular block retaining wall; 70 CY common excavation; 28 CY topsoil borrow; 332 SY sodding; etc.
Decision makers connected to this RFP from Chautauqua County.