CityTX
Posted
Aug 19, 2026
Sep 17, 2026
PW 2027 Asphalt Resurfacing Contract 2
The major work will consist of the (approx.) following: 2,365 LF 7" curb and gutter; 6,220 SF 6" concrete driveway; 9,600 SF 4" concrete sidewalk; 9,800 SY 2" asphalt pavement, superpave SP-D; 9,800 SY 3" surface milling; 41,170 SY 3" asphalt pavement, superpave SP-D; 9,800 SY 4" asphalt base pvmt type B (DG-B); 50,970 SY 11" pavement pulverization; 815 TN cemlime™; 37 EA barrier free ADA ramp.