Summary
The Eastern Municipal Water District (EMWD) is soliciting bids for the PVRWRF Secondary Clarifiers 5, 6, and 8 Rehabilitation Project (Specification No. 1592S), a public works construction project located at the Perris Valley Regional Water Reclamation Facility at 1301 Case Road, Perris, California. The scope of work includes the removal and replacement of secondary clarifier mechanisms and accessories within existing Secondary Clarifier Nos. 5, 6, and 8, including new spiral scrapers, center column, feedwell, floor baffle, bridge, scum trough, scum baffle, scum weir, Stamford baffle, and electrical and control elements. The District has shortlisted two secondary clarifier mechanism manufacturers to be used without equal, and the project duration is 730 calendar days, with bonds required and prevailing wages applicable.