Eastern Municipal Water District
Special DistrictCA
Posted
Aug 25, 2026
Oct 20, 2026
Purified Water Replenishment SJV Advanced Water Purification Facility
Eastern Municipal Water District is soliciting an electronic lump-sum bid from qualified California Class A general engineering contractors for construction of the San Jacinto Valley Advanced Water Purification Facility and associated brine ponds. The work includes site and building construction, ultrafiltration and reverse-osmosis systems, process piping, pipelines, electrical, instrumentation and control systems, brine-pond liners, and evaporator and mechanical systems, with a 1,095-calendar-day duration. This is a public-works construction procurement rather than a grant, requires a 10% bid bond and mandatory onsite pre-bid meeting, and responses are due October 20, 2026 at 10:00 a.m. PDT.