Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pump, vertical turbine sump operating point: 200 gpm @ 103 ft. Head working fluid: wastewater @ 70 degrees fahrenheit sump pit depth: 16 ft. Stages: 4 driver type: vertical hollow shaft motor total pump length: 182.40" / 15.20 ft. Total column length: 146.07". Bowl assembly length: 36.33" Discharge flange: 6.00". - 150# column diameter: 6.00". Head assembly discharge material: astm a53 carbon steel head shaft material: grade 416 stainless steel column pipe material: schedule 40 astm a53 carbon steel column coupling material: schedule 40 astm a53 carbon steel column assembly line shaft material: grade 416 stainless steel bowl material: astm a48 class 30 cast iron with glass enamel discharge bowl material: astm a48 class 30b cast iron suction type: bell suction material: astm a48 class 30b cast iron impeller attachment: taper lock impeller trim: 4. 88 in. Impeller material: grade 316 stainless steel strainer material: grade 316 stainless steel mounting flange square dimensions: 24". By 24" Mounting flange hole diameter: 0.88". Mounting hole quantity: 4 mounting flange bolt square separation: 21". Underground discharge flange: 6". Below mounting flange bowl coating: scotchkote 134 fusion epoxy (12 mils) column coating inner and outer diameter: scotchkote 134 fusion epoxy (12 mils) head coating inner and outer diameter: scotchkote 134 fusion epoxy (12 mils) motor part number: h010b2a1eb-cvru-100a0b000 motor power: 10 hp. Motor speed: 1800 rpm motor phase and frequency: 3 phase/60 hz. Voltage: 230/460 v. Motor height: 21.13". Motor base diameter: 10 in. "goulds" #vit-futm 7chc.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The removal, replacement, and installation of complete sewage sump pump systems. Install complete sewage sump pump systems: City Hall Sub-Basement needs to replace the faulty sewage sump pump bearing, discharge piping inside the pit, a full-port gate, check valves, and upgrade the controls. EOC Sub-Basement requires the replacement of the discharge piping inside the pit, upgrading of the controls, a full-port gate, and check valves. Police Station requires the replacement of two (2) sump pump systems, a full-port gate, check valves, upgrading of controls, and a new 208/230 volt 20 amp circuit.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
The removal, replacement, and installation of complete sewage sump pump systems. Install complete sewage sump pump systems: City Hall Sub-Basement needs to replace the faulty sewage sump pump bearing, discharge piping inside the pit, a full-port gate, check valves, and upgrade the controls. EOC Sub-Basement requires the replacement of the discharge piping inside the pit, upgrading of the controls, a full-port gate, and check valves. Police Station requires the replacement of two (2) sump pump systems, a full-port gate, check valves, upgrading of controls, and a new 208/230 volt 20 amp circuit.
AvailableThe Los Angeles Department of Water and Power (LADWP) issued Invitation for Bid 145049 for a PUMP, SUMP. The bid documents are accessible through LADWP's electronic Request Solicit Procure (eRSP) system and mail-in/hard-copy submissions are not accepted. The solicitation opened on 2025-12-15 and closes on 2026-01-05.
Posted Date
Dec 15, 2025
Due Date
Jan 5, 2026
Release: Dec 15, 2025
Close: Jan 5, 2026
The Los Angeles Department of Water and Power (LADWP) issued Invitation for Bid 145049 for a PUMP, SUMP. The bid documents are accessible through LADWP's electronic Request Solicit Procure (eRSP) system and mail-in/hard-copy submissions are not accepted. The solicitation opened on 2025-12-15 and closes on 2026-01-05.
AvailableApprox 4550 LF 4" sump pump collector; 4550 LF 4" boring; 4550 LF tracer wire; etc. See attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 8, 2026
Release: Dec 19, 2025
Close: Jan 8, 2026
Approx 4550 LF 4" sump pump collector; 4550 LF 4" boring; 4550 LF tracer wire; etc. See attached file.
AvailableProvide cleaning of oil and water separators, sump, catch basins, and floor drain line jetting services.
Posted Date
Dec 12, 2025
Due Date
Feb 6, 2026
Release: Dec 12, 2025
Close: Feb 6, 2026
Provide cleaning of oil and water separators, sump, catch basins, and floor drain line jetting services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis