Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replace existing pump station 33 control panel and level control instrumentation. Install new concrete equipment pad to support the control panel. Commission proposed control panel and conduct demolition of existing control panel. Temporary pumping and hauling from wet well during switchover to proposed control panel. Including all necessary appurtenances and restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
AvailablePremium
Access the largest public sector contact database
Recoat degraded concrete within the wet well and replacement of pumps and discharge piping, remove the exiting fiberglass pump station structure and replace with a new quadplex grinder packaged pump, remove the exiting concrete pump station structures and replace with a new precast concrete duplex submersible pump station.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
Recoat degraded concrete within the wet well and replacement of pumps and discharge piping, remove the exiting fiberglass pump station structure and replace with a new quadplex grinder packaged pump, remove the exiting concrete pump station structures and replace with a new precast concrete duplex submersible pump station.
AvailableThe City of Pacific Grove requests sealed bids for wastewater pump station services for the 15.5 Crespi Pond Pump Station, performed per the project plans and specifications. This is a public works contract requiring contractor/subcontractor registration with the California Department of Industrial Relations and payment of Monterey County prevailing wages; award to the lowest responsible bidder.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
The City of Pacific Grove requests sealed bids for wastewater pump station services for the 15.5 Crespi Pond Pump Station, performed per the project plans and specifications. This is a public works contract requiring contractor/subcontractor registration with the California Department of Industrial Relations and payment of Monterey County prevailing wages; award to the lowest responsible bidder.
AvailableRemoval and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
Posted Date
Jun 18, 2025
Due Date
Jan 15, 2026
Release: Jun 18, 2025
Close: Jan 15, 2026
Removal and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis