Gateway Services Community Development District
Special DistrictFL
Posted
Nov 7, 2026
Dec 21, 2026
Public Works Storage Building
The Work consists of obtaining all building permits and furnishing all labor, equipment, and materials to construct a pre-engineered metal building (PEMB) and associated site improvements, including but not limited to the following: 1. Erosion and sediment control 2. Site clearing 3. Rough grading 4. Foundation 5. PEMB along with: a. (4) Motorized overhead doors b. R-19 bag & batt insulation c. (2) HVLS & exhaust fans d. Interior and exterior lighting e. Electrical power and control systems f. Fire alarm system g. Rough-in for Owner-furnished security systems 6. Paving 7. Drainage 8. Final grading 9. Sodding The scope is further defined and detailed within the Plans, Technical Specifications, and General Conditions associated with this project. The CONTRACTOR is responsible for reviewing all documentation associated with this project. All work shall conform to applicable federal, state, county, and District regulations, standards, and specifications.
