Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation and implementation of an Advanced Metering Infrastructure (AMI) System. The scope will include the selection and implementation of a Fixed Based System that will work effectively with the City's personnel and existing water infrastructure. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work to be done under this Contract will include, but is not necessarily limited to, furnishing and implementing a complete Advanced Metering Infrastructure (AMI) system, including hardware, software, training, and support services; and furnishing meter interface units (MIUs) and water meters compatible with the AMI system.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
The work to be done under this Contract will include, but is not necessarily limited to, furnishing and implementing a complete Advanced Metering Infrastructure (AMI) system, including hardware, software, training, and support services; and furnishing meter interface units (MIUs) and water meters compatible with the AMI system.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide Consulting Services for the Public Utilities Department's business practices.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Provide Consulting Services for the Public Utilities Department's business practices.
Provide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
Posted Date
Nov 26, 2025
Due Date
Feb 5, 2026
Release: Nov 26, 2025
Close: Feb 5, 2026
Provide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
AvailableFurnish and install an emergency diesel generator at the water system lift station. The generator is to be placed on properly size concrete pad meeting required manufacturer specifications. The minimum specifications needed for sufficient capacity to handle the total power demand of the water system are 200KW/60Hertz @ 1,800RPM. This specific capacity will ensure the new generator is compatible with the existing electrical system and controls. Retrofitting the system to accommodate the new generator, including wiring, controls, and fuel lines will also be performed.
Posted Date
Dec 11, 2025
Due Date
Feb 3, 2026
Release: Dec 11, 2025
Close: Feb 3, 2026
Furnish and install an emergency diesel generator at the water system lift station. The generator is to be placed on properly size concrete pad meeting required manufacturer specifications. The minimum specifications needed for sufficient capacity to handle the total power demand of the water system are 200KW/60Hertz @ 1,800RPM. This specific capacity will ensure the new generator is compatible with the existing electrical system and controls. Retrofitting the system to accommodate the new generator, including wiring, controls, and fuel lines will also be performed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →