Gas Utility District #1 of East Baton Rouge
Special DistrictLA
Posted
Nov 20, 2026
Dec 10, 2026
Replacement of PVC Natural Gas Distribution Facilities Northwestern Area RFP
Project consists of replacing existing PVC Natural Gas mains with approx 55,500 LF of 4"MDPE coiled pipe and approx 31,200 LF of 2" MDPE coiled pipe. The project also requires the replacement of service pipe totaling approx 18,900 LF of 3/4" MDPE pipe. Included in the new gas distribution system is the installation of 4 and 2 MDPE ball valves, tracer wire pedestals, and necessary road bores and tie-ins to the existing 4 and 2" gas mains. The project also requires service taps and the transfer of approx 317 existing customers to the new main. The successful bidder will also be required to furnish incidentals such as miscellaneous fittings, tracer wire, detector tape, and provide a pressure test meeting PHMSA requirements at 90 PSI on all new MDPE piping or 1.5 MAOP to establish a turn-key project.
