Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The companies must have experienced in overhauling two (2) large (108 MGD) vertical shaft pumps. The work consists of completely disassembling the pumps and drives and reassembling with new pump rotors and seals. In addition, engineering tasks shall be performed to evaluate pump performance and vibration. The Commission will provide the new pump rotors and seals which are being sourced from the original equipment manufacturer. The scope includes all labor, tools, rigging, equipment, any additional parts and materials, and supervision to overhaul the two pumps at the Low Lift Pump Station (LLPS). It is expected that a qualified subcontractor will be used to conduct the pump performance test and vibration analysis, and to engineer any remedial tasks.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Campground shower house lift station pumps.
Posted Date
Jan 12, 2026
Due Date
Feb 9, 2026
Release: Jan 12, 2026
Close: Feb 9, 2026
Campground shower house lift station pumps.
AvailableInstallation of a new lift station building and submersible pumps to replace the existing underground lift station enclosure. The work shall include the installation of a new masonry building, piping, and submersible pumps, all mechanical and electrical work, pump control panels, modifications to the existing wet well, connection to the City’s existing SCADA system, a new emergency generator, installation of new force main pipes and connection to the existing force main, abandonment of the existing station, site paving, and other associated site restoration.
Posted Date
Jan 27, 2026
Due Date
Feb 17, 2026
Release: Jan 27, 2026
Close: Feb 17, 2026
Installation of a new lift station building and submersible pumps to replace the existing underground lift station enclosure. The work shall include the installation of a new masonry building, piping, and submersible pumps, all mechanical and electrical work, pump control panels, modifications to the existing wet well, connection to the City’s existing SCADA system, a new emergency generator, installation of new force main pipes and connection to the existing force main, abandonment of the existing station, site paving, and other associated site restoration.
Construction and commissioning of a new sanitary sewer pump station located on City property west of Demers Drive including a new wet well, pumps, telemetry, utilities, fencing and landscape restoration. Project also includes removal and decommission of the existing pump station.
Posted Date
-
Due Date
Feb 3, 2026
Release: -
Close: Feb 3, 2026
Construction and commissioning of a new sanitary sewer pump station located on City property west of Demers Drive including a new wet well, pumps, telemetry, utilities, fencing and landscape restoration. Project also includes removal and decommission of the existing pump station.
AvailableSchedule A: rehabilitation of the existing palouse mall lift station includes replacing the wet well cover and hatch, replacing of the existing pumps with submersible pumps, new electrical/control, upgrading the existing force main out of the wet well, fence upgrades, and the installation of a new valve vault and flow meter vault.
Posted Date
Jan 24, 2026
Due Date
Feb 17, 2026
Release: Jan 24, 2026
Close: Feb 17, 2026
Schedule A: rehabilitation of the existing palouse mall lift station includes replacing the wet well cover and hatch, replacing of the existing pumps with submersible pumps, new electrical/control, upgrading the existing force main out of the wet well, fence upgrades, and the installation of a new valve vault and flow meter vault.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis