Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of a new lift station building and submersible pumps to replace the existing underground lift station enclosure. The work shall include the installation of a new masonry building, piping, and submersible pumps, all mechanical and electrical work, pump control panels, modifications to the existing wet well, connection to the City’s existing SCADA system, a new emergency generator, installation of new force main pipes and connection to the existing force main, abandonment of the existing station, site paving, and other associated site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx 1 LS lift station rehabilitation; 1 LS SCADA instrumentation, metering equipment, installation and training; 1 EA project sign.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
Work includes approx 1 LS lift station rehabilitation; 1 LS SCADA instrumentation, metering equipment, installation and training; 1 EA project sign.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lake Cities Municipal Utility Authority is soliciting sealed bids for the rehabilitation of an existing lift station near Folly Beach Rd and N Hook St in Denton County, Texas. Bids are due at 2:00 PM CST on February 3, 2026, at 501 N Shady Shores Drive, Lake Dallas, TX 75065. The project involves upgrades and rehabilitation work at Lift Station #9; no grant funding is indicated.
Posted Date
-
Due Date
Feb 3, 2026
Release: -
Close: Feb 3, 2026
Lake Cities Municipal Utility Authority is soliciting sealed bids for the rehabilitation of an existing lift station near Folly Beach Rd and N Hook St in Denton County, Texas. Bids are due at 2:00 PM CST on February 3, 2026, at 501 N Shady Shores Drive, Lake Dallas, TX 75065. The project involves upgrades and rehabilitation work at Lift Station #9; no grant funding is indicated.
AvailablePlantation Municipal Utility District in Fort Bend County, Texas is requesting sealed bids for the rehabilitation of Lift Station No. 1. The work typically includes wet well and above-ground piping rehabilitation, protective coatings, selected piping and valve replacements, and bypass pumping to maintain service during construction. Bid specifications and addenda are posted on CivCast, and bids are due on February 14, 2026.
Posted Date
-
Due Date
Feb 14, 2026
Close: Feb 14, 2026
Plantation Municipal Utility District in Fort Bend County, Texas is requesting sealed bids for the rehabilitation of Lift Station No. 1. The work typically includes wet well and above-ground piping rehabilitation, protective coatings, selected piping and valve replacements, and bypass pumping to maintain service during construction. Bid specifications and addenda are posted on CivCast, and bids are due on February 14, 2026.
AvailableSchedule A: rehabilitation of the existing palouse mall lift station includes replacing the wet well cover and hatch, replacing of the existing pumps with submersible pumps, new electrical/control, upgrading the existing force main out of the wet well, fence upgrades, and the installation of a new valve vault and flow meter vault.
Posted Date
Jan 24, 2026
Due Date
Feb 17, 2026
Release: Jan 24, 2026
Close: Feb 17, 2026
Schedule A: rehabilitation of the existing palouse mall lift station includes replacing the wet well cover and hatch, replacing of the existing pumps with submersible pumps, new electrical/control, upgrading the existing force main out of the wet well, fence upgrades, and the installation of a new valve vault and flow meter vault.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →