Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provision of a 6x6 side by side UTV. Specifications to include: 1000cc minimum installed equipment to include: (4) 5" dual color strobe lights (red/ blue) with flood light install kit for light bar, 12" light bar pair of side mirrors, complete turn signal kit compact emergency siren labor.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Wet side idlers.
Posted Date
Dec 30, 2025
Due Date
Jan 30, 2026
Release: Dec 30, 2025
Close: Jan 30, 2026
Wet side idlers.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Metro p/n: 188279 description: glass - lower, side emergency & side destination sign, 5mm, 13% gray, #2 & #3 c/s and #2 & #4 s/s windows approved mfr: stormtite approved mfg#: ar0007303.
Posted Date
Jan 20, 2026
Due Date
Jan 27, 2026
Release: Jan 20, 2026
Close: Jan 27, 2026
Metro p/n: 188279 description: glass - lower, side emergency & side destination sign, 5mm, 13% gray, #2 & #3 c/s and #2 & #4 s/s windows approved mfr: stormtite approved mfg#: ar0007303.
AvailableWork includes south side envelope repairs.
Posted Date
Jan 8, 2026
Due Date
Feb 3, 2026
Release: Jan 8, 2026
Close: Feb 3, 2026
Work includes south side envelope repairs.
AvailableProvide Mill Ditch Erosion Correction (South Side) project. This erosion stabilisation project will be completed along the south side of Mill Creek beginning atthe Balch Road and Mill Road intersection extending east to the bridge. Stabilisation TRM (Pyramat) is to be installed per manufacturer recommendations with one foot and three foot anchors.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Provide Mill Ditch Erosion Correction (South Side) project. This erosion stabilisation project will be completed along the south side of Mill Creek beginning atthe Balch Road and Mill Road intersection extending east to the bridge. Stabilisation TRM (Pyramat) is to be installed per manufacturer recommendations with one foot and three foot anchors.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →