Industry Day - Selma AL Flood Management Risk and Bank RFP
Flood management risk and bank. The soldier pile wall would be constructed to a top elevation of 100' NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110' NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90' NAVD88.