Special DistrictTX
-
Closes
Aug 7, 2026
Proposed Excavation, Grading, and Storm Water Facilities to Serve Brookside on the Prairie Detention
The project seeks construction of excavation, grading, and storm-water facilities serving the Brookside on the Prairie Detention area. The work includes approximately 106,000 cubic yards of excavation and approximately 284 linear feet of storm sewer ranging from 36-inch to 60-inch RCP. This is a privately funded construction bid, not a grant program, with bids due August 7, 2026, at 8:00 AM Central Time.