Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct a new lab/chlorination building and raising wells 5, 6 and 7 above the 100 year flood plain.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: -
Close: Feb 4, 2026
Proposed lift station 4-7 improvements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct the Modernization Improvements at the WTP Phase II - Vertical Well 2-5 replacement project. The work includes Demolition and abandonment of existing Vertical Wells 2 - 5 as indicated and necessary for the construction of the project including the removal of the vertical well structures, vaults, and associated piping and abandonment of the wells in accordance with MDNR. Installation of the new replacement Vertical Wells 2R - 5R as indicated for construction of the project.
Posted Date
Jan 5, 2026
Due Date
Feb 3, 2026
Release: Jan 5, 2026
Close: Feb 3, 2026
Construct the Modernization Improvements at the WTP Phase II - Vertical Well 2-5 replacement project. The work includes Demolition and abandonment of existing Vertical Wells 2 - 5 as indicated and necessary for the construction of the project including the removal of the vertical well structures, vaults, and associated piping and abandonment of the wells in accordance with MDNR. Installation of the new replacement Vertical Wells 2R - 5R as indicated for construction of the project.
AvailableProject includes: 1 ls, preparing the right of way; 10,800 lf, temporary sediment control fence; 190 lf boring and casing, 30"; 40 lf casing by other than open cut, 30"; 10,981 PVC (C-905, DR-18) pipe, 16"16"; 13 ea fire hydrant assembly, restrained; 6 ea relocate existing service; 4.2 tn ductile iron fittings; 5 ea combination air valve, 2"; 28 ea gate valve and box, 16". See attached file.
Posted Date
Dec 30, 2025
Due Date
Jan 20, 2026
Release: Dec 30, 2025
Close: Jan 20, 2026
Project includes: 1 ls, preparing the right of way; 10,800 lf, temporary sediment control fence; 190 lf boring and casing, 30"; 40 lf casing by other than open cut, 30"; 10,981 PVC (C-905, DR-18) pipe, 16"16"; 13 ea fire hydrant assembly, restrained; 6 ea relocate existing service; 4.2 tn ductile iron fittings; 5 ea combination air valve, 2"; 28 ea gate valve and box, 16". See attached file.
AvailablePurchase of pulsar chlorination tablets for the city of troy family aquatic center and community center pools.
Posted Date
Jan 7, 2026
Due Date
Jan 22, 2026
Release: Jan 7, 2026
Close: Jan 22, 2026
Purchase of pulsar chlorination tablets for the city of troy family aquatic center and community center pools.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →