Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide professional services for the replacement of key Programmable Logic Controllers (PLCs) and to support the SCADA system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace and upgrade the existing programmable logic controller (plc) device for a bus vacuum system. Conduct an initial assessment of current plc device and vacuum system. Following the assessment, the contractor shall be responsible for the complete demo of old plc device and the installation of the new digital controller, including all required cabling, conduit, materials, and labor. This upgrade will provide a reliable system and minimize downtime in case of any unexpected failures.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
Close: Dec 12, 2025
Replace and upgrade the existing programmable logic controller (plc) device for a bus vacuum system. Conduct an initial assessment of current plc device and vacuum system. Following the assessment, the contractor shall be responsible for the complete demo of old plc device and the installation of the new digital controller, including all required cabling, conduit, materials, and labor. This upgrade will provide a reliable system and minimize downtime in case of any unexpected failures.
Premium
Access the largest public sector contact database
Storm Pump Station Telemetry and Supervisory Control and Data (“SCADA”) System.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Close: Dec 19, 2025
Storm Pump Station Telemetry and Supervisory Control and Data (“SCADA”) System.
AvailableThe Town of Blackstone, Virginia is soliciting sealed bids for a Supervisory Control & Data Acquisition (SCADA) System Master Station Upgrade. Bids are due by 2:00 PM local time on January 6, 2026 at Town Hall.
Posted Date
Nov 14, 2025
Due Date
Jan 6, 2026
Release: Nov 14, 2025
Close: Jan 6, 2026
The Town of Blackstone, Virginia is soliciting sealed bids for a Supervisory Control & Data Acquisition (SCADA) System Master Station Upgrade. Bids are due by 2:00 PM local time on January 6, 2026 at Town Hall.
AvailableThe Town of Blackstone, Virginia is soliciting sealed bids for a Supervisory Control & Data Acquisition (SCADA) System Master Station Upgrade. Bids are due by 2:00 PM local time on January 6, 2026 at Town Hall.
Posted Date
Nov 14, 2025
Due Date
Jan 6, 2026
Release: Nov 14, 2025
Close: Jan 6, 2026
The Town of Blackstone, Virginia is soliciting sealed bids for a Supervisory Control & Data Acquisition (SCADA) System Master Station Upgrade. Bids are due by 2:00 PM local time on January 6, 2026 at Town Hall.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis