Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for professional services to design HVAC improvements, including renovation and potential electrification design, for the Filter, Flocculation, and Sedimentation Building and the Source Water Pump Station at a Recycling Treatment Plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The purpose of this project is to renovate the hvac equipment at the recycling treatment plant's filter, flocculation, and sedimentation building, and source water pump station. Create heat loading models in trace 3d plus or similar of each of the facilities and provide a recommendation on total required heating and cooling loads for each facility. Perform duct pressure drop and natural gas pipe sizing calculations for all equipment to be replaced; provide a materials analysis on the radiant heaters and coatings for the natural gas piping to select the best materials to be compatible with the chlorine in the facility. Consider alternative materials, such as ceramic, and provide a recommendation. Update system designs to ensure that hvac systems meet all current building, mechanical, fuel and gas, and energy efficiency code requirements.
Posted Date
Jan 2, 2026
Due Date
Jan 22, 2026
Provide CMAR for retrofitting the filters at a 28.8 MGD water treatment plant, preconstruction services including design constructability reviews and procurement services. Scope of work includes filter underdrain removal and replacement, removing and patching cast-in-place and grout in filter tanks, filter media removal and disposal, filter GAC media replacement, pipe modifications to facilitate media removal and replacement, non-potable water line for a new yard hydrant located outside the facility, and retrofitting filters to maintain continuity of plant operations.
Posted Date
Dec 25, 2025
Due Date
Jan 23, 2026
Release: Dec 25, 2025
Close: Jan 23, 2026
Provide CMAR for retrofitting the filters at a 28.8 MGD water treatment plant, preconstruction services including design constructability reviews and procurement services. Scope of work includes filter underdrain removal and replacement, removing and patching cast-in-place and grout in filter tanks, filter media removal and disposal, filter GAC media replacement, pipe modifications to facilitate media removal and replacement, non-potable water line for a new yard hydrant located outside the facility, and retrofitting filters to maintain continuity of plant operations.
Work include construction of heating, ventilation and air conditioning (hvac) system for the proposed water treatment plant and raw water pump station.
Posted Date
Dec 16, 2025
Due Date
Feb 4, 2026
Release: Dec 16, 2025
Close: Feb 4, 2026
Work include construction of heating, ventilation and air conditioning (hvac) system for the proposed water treatment plant and raw water pump station.
AvailableThis RFP is for the complete replacement of a final effluent pumping station, replacement of secondary clarifier mechanisms, piping improvements, site grading and landscaping, and associated structural and electrical work at the West Point Treatment Plant.
Posted Date
-
Due Date
Feb 19, 2026
Close: Feb 19, 2026
This RFP is for the complete replacement of a final effluent pumping station, replacement of secondary clarifier mechanisms, piping improvements, site grading and landscaping, and associated structural and electrical work at the West Point Treatment Plant.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The purpose of this project is to renovate the hvac equipment at the recycling treatment plant's filter, flocculation, and sedimentation building, and source water pump station. Create heat loading models in trace 3d plus or similar of each of the facilities and provide a recommendation on total required heating and cooling loads for each facility. Perform duct pressure drop and natural gas pipe sizing calculations for all equipment to be replaced; provide a materials analysis on the radiant heaters and coatings for the natural gas piping to select the best materials to be compatible with the chlorine in the facility. Consider alternative materials, such as ceramic, and provide a recommendation. Update system designs to ensure that hvac systems meet all current building, mechanical, fuel and gas, and energy efficiency code requirements.
Available