Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rent/lease a temporary clarifier for the waste water treatment plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work generally consists of completing repairs on eight clarifiers, including rebuilding two secondary clarifier drives, replacing anode discs and gates, and assisting in the condition inspection of the secondary process system.
Posted Date
Dec 23, 2025
Due Date
Jan 21, 2026
Release: Dec 23, 2025
Close: Jan 21, 2026
The work generally consists of completing repairs on eight clarifiers, including rebuilding two secondary clarifier drives, replacing anode discs and gates, and assisting in the condition inspection of the secondary process system.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
Close: Jan 13, 2026
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
AvailableProject consists of the demolition of the existing mechanical equipment for secondary clarifier numbers 1 and 2, the installation of new clarifier mechanisms and components, construction of a new flow distribution box with associated piping, and civil site improvements. See outside link.
Posted Date
Dec 18, 2025
Due Date
Feb 11, 2026
Release: Dec 18, 2025
Close: Feb 11, 2026
Project consists of the demolition of the existing mechanical equipment for secondary clarifier numbers 1 and 2, the installation of new clarifier mechanisms and components, construction of a new flow distribution box with associated piping, and civil site improvements. See outside link.
AvailableThe San Antonio River Authority invites bids for the structural, process, and electrical rehabilitation of Secondary Clarifiers No. 27 and No. 37 at the Salitrillo Wastewater Treatment Plant in Converse, TX. The engineer's estimate for this project is approximately $4 million. The solicitation documents are available on the Authority’s procurement portal. Questions are due December 23, 2025, and proposals are due January 8, 2026.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
The San Antonio River Authority invites bids for the structural, process, and electrical rehabilitation of Secondary Clarifiers No. 27 and No. 37 at the Salitrillo Wastewater Treatment Plant in Converse, TX. The engineer's estimate for this project is approximately $4 million. The solicitation documents are available on the Authority’s procurement portal. Questions are due December 23, 2025, and proposals are due January 8, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →