Summary
Project consists of the reconstruction of 2.35 miles of Thomas Road from FM 51 to approximately Knob Road at which Thomas Road becomes Knob Road (southbound) and consist of the reconstruction of 0.23 miles Knob Road from Thomas Road to approximately 100 ft north of Knob Road Summerfield Court. The proposed improvements consist of pulverizing the existing asphalt pavement and aggregate base material, treating with cement, then placing flexible base followed by a HMAC surface course. The project includes roadside ditch reshaping, culvert improvements for crossing culverts and driveway culverts, signage and striping, revegetation of the roadside ditches. The project also includes profile changes to Thomas Road as it approaches FM 51, adding a culvert under Thomas Road at FM 51 and realignment of Thomas Road for approximately 800 ft.