Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
UConn Health Center is soliciting prequalification applications to renovate approximately 3,200 sq ft of occupied laboratory medicine spaces, including microbiology, core, and hematology labs. The project involves asbestos abatement, demolition, new partition walls, and upgrades to mechanical, plumbing, and fire protection systems with an estimated value between $800,000 and $1,200,000. Applicants must be prequalified by the Connecticut Department of Administrative Services in General Building Construction (Group C) to be eligible.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This is a prequalification Request for Qualification for renovation of approximately 3,200 sf of laboratory medicine spaces at UConn Health. Work includes phased asbestos abatement, demolition, new partitions, finishes, laboratory casework, and mechanical/plumbing/electrical/fire protection systems. Contractors must be prequalified by the Department of Administrative Services (DAS) in General Building Construction (Group C) for this project estimated at $2,400,000.
Posted Date
Jan 27, 2026
Due Date
Feb 17, 2026
Release: Jan 27, 2026
Close: Feb 17, 2026
This is a prequalification Request for Qualification for renovation of approximately 3,200 sf of laboratory medicine spaces at UConn Health. Work includes phased asbestos abatement, demolition, new partitions, finishes, laboratory casework, and mechanical/plumbing/electrical/fire protection systems. Contractors must be prequalified by the Department of Administrative Services (DAS) in General Building Construction (Group C) for this project estimated at $2,400,000.
AvailableThe project consists of renovating approx 3,200 sf of the existing occupied laboratory medicine spaces involving microbiology, core, hematology, urinalysis, bone marrow, flow cytometry labs and the autoclave/glass washroom under multiple phases. Work consists of but is not limited to asbestos abatement, demolition, new partition walls, flooring, ceilings, painting, laboratory casework, mechanical, plumbing, electrical, fire protection and fire alarm.
Posted Date
Jan 27, 2026
Due Date
Feb 17, 2026
Release: Jan 27, 2026
Close: Feb 17, 2026
The project consists of renovating approx 3,200 sf of the existing occupied laboratory medicine spaces involving microbiology, core, hematology, urinalysis, bone marrow, flow cytometry labs and the autoclave/glass washroom under multiple phases. Work consists of but is not limited to asbestos abatement, demolition, new partition walls, flooring, ceilings, painting, laboratory casework, mechanical, plumbing, electrical, fire protection and fire alarm.
Work includes renovate the lab. The scope will include, but not limited to, new walls, finishes, equipment, plumbing, electrical distribution, lighting, and expanding the current HVAC systems.
Posted Date
Jan 14, 2026
Due Date
Feb 20, 2026
Release: Jan 14, 2026
Close: Feb 20, 2026
Work includes renovate the lab. The scope will include, but not limited to, new walls, finishes, equipment, plumbing, electrical distribution, lighting, and expanding the current HVAC systems.
AvailableClinical lab services.
Posted Date
-
Due Date
Jun 1, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis