Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This is a presolicitation for the Veterans Point Trail Rehabilitation Project to rehabilitate an existing asphalt trail and associated structures at Veterans Point in Black Hills National Forest (Pennington County, South Dakota). Work includes crack filling and sealing, reconstruction of select trail sections, stabilization of eroding areas, asphalt seal coating, replacing timber retaining walls with segmental concrete block walls, constructing gabion baskets, repairing/removing pipe railings, and removal of certain amenities; an optional bid item covers work on a lakeshore loop. Period of performance is March 15, 2026 May 20, 2027, and the government requests submission of a Capability Statement by the response deadline.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Veterans Point Trail Rehabilitation Project involves the rehabilitation of a 2,959-foot-long asphalt trail with metal railing and timber retaining walls. This is a pre-solicitation notice for a contract opportunity issued by the U.S. Department of Agriculture - Forest Service. Responses are due by January 14, 2026, and require submitting a Capability Statement.
Posted Date
Dec 19, 2025
Due Date
Jan 14, 2026
Release: Dec 19, 2025
Close: Jan 14, 2026
The Veterans Point Trail Rehabilitation Project involves the rehabilitation of a 2,959-foot-long asphalt trail with metal railing and timber retaining walls. This is a pre-solicitation notice for a contract opportunity issued by the U.S. Department of Agriculture - Forest Service. Responses are due by January 14, 2026, and require submitting a Capability Statement.
AvailableTrail rehabilitation project.The asphalt trail is deteriorating, with severe oxidation, cracks, heaving, and undercutting in the asphalt. The retaining walls are leaning and no longer keep material off the trail. This project will fill and seal the cracks, reconstruction select sections, stabilize eroding areas, and apply a seal coat to the asphalt. Timber retaining walls will be removed and reconstructed with segmental concrete block retaining walls. The pipe railing is damaged in some areas. This project will also repair the damaged sections of railing and eliminate sections where the railing is not needed. The project will also construct reinforcement with gabion (wire rock baskets) to repair eroded sections at the trails edge and bridge abutments. Existing timber retaining walls will be removed. New larger retaining walls will be constructed. See attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 14, 2026
Release: Dec 19, 2025
Close: Jan 14, 2026
The Oregon Department of Transportation is preparing to update the City of Eagle Point's Transportation System Plan (TSP). This pre-solicitation notice, identified as Bid Number S-73000-00015534, was posted on December 15, 2025, with a bid opening date of January 12, 2026. The opportunity is a procurement pre-solicitation (mini-RFP) and is currently open for bidding.
Posted Date
Dec 15, 2025
Due Date
Jan 13, 2026
Release: Dec 15, 2025
Close: Jan 13, 2026
The Oregon Department of Transportation is preparing to update the City of Eagle Point's Transportation System Plan (TSP). This pre-solicitation notice, identified as Bid Number S-73000-00015534, was posted on December 15, 2025, with a bid opening date of January 12, 2026. The opportunity is a procurement pre-solicitation (mini-RFP) and is currently open for bidding.
This is a pre‑solicitation notice for the Bunton Creek Road Improvement project (Lehman Road to Porter Cove) that will include intersection improvements, widening travel lanes, upgrades to pedestrian and bicycle facilities, and construction of a new roundabout at Bunton Creek Road & Goforth Road. The posting on the City of Kyle procurement portal is explicitly a notice (no contract will be awarded from this posting) and lists an offers due date for when the solicitation is expected (Jan 31, 2026). Project documents/100% plans are listed on the procurement portal downloads but full solicitation documents are not publicly downloadable without portal access.
Posted Date
Dec 18, 2025
Due Date
Jan 31, 2026
Release: Dec 18, 2025
Close: Jan 31, 2026
This is a pre‑solicitation notice for the Bunton Creek Road Improvement project (Lehman Road to Porter Cove) that will include intersection improvements, widening travel lanes, upgrades to pedestrian and bicycle facilities, and construction of a new roundabout at Bunton Creek Road & Goforth Road. The posting on the City of Kyle procurement portal is explicitly a notice (no contract will be awarded from this posting) and lists an offers due date for when the solicitation is expected (Jan 31, 2026). Project documents/100% plans are listed on the procurement portal downloads but full solicitation documents are not publicly downloadable without portal access.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Trail rehabilitation project.The asphalt trail is deteriorating, with severe oxidation, cracks, heaving, and undercutting in the asphalt. The retaining walls are leaning and no longer keep material off the trail. This project will fill and seal the cracks, reconstruction select sections, stabilize eroding areas, and apply a seal coat to the asphalt. Timber retaining walls will be removed and reconstructed with segmental concrete block retaining walls. The pipe railing is damaged in some areas. This project will also repair the damaged sections of railing and eliminate sections where the railing is not needed. The project will also construct reinforcement with gabion (wire rock baskets) to repair eroded sections at the trails edge and bridge abutments. Existing timber retaining walls will be removed. New larger retaining walls will be constructed. See attached file.