Bloomfield Borough Water Authority
Special DistrictPA
Posted
Jul 31, 2026
Sep 9, 2026
Waterline Replacement – West Main St & Cold Storage Rd
Construction of up to 2,100 LF of 8” ductile iron water main replacement and extension.
Description: The U.S. Embassy in Muscat is soliciting offers under a combined synopsis/solicitation to replace the Chancery building’s main waterline. The work includes demolition of the existing cast-iron pipe, installation of a new 4-inch HDPE pipeline with protective sleeve, connection to the municipal water supply, surface restoration, testing, and as-built documentation. Offers are due September 14, 2026, at 11:59 p.m. GMT+4, and the notice identifies the U.S. Department of State as the agency and the U.S. Embassy Muscat as the issuing office.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from Department of State.
Adjacent opportunities open for bidding right now.
Bloomfield Borough Water Authority
Special DistrictPA
Posted
Jul 31, 2026
Sep 9, 2026
Construction of up to 2,100 LF of 8” ductile iron water main replacement and extension.
FederalDC
Posted
Aug 5, 2026
Sep 3, 2026
The U.S. Department of State, through the U.S. Embassy Panama City, issued an RFQ for replacement of the chancery fuel dispenser. The active SAM.gov notice identifies the procurement as a Solicitation and lists four public PDF attachments, including an invitation letter and an attachment to SF-1449. Quotations are due September 3, 2026, at 3:30 p.m. EST.
CitySC
Posted
Aug 10, 2026
Sep 10, 2026
Work includes approx 3,500 LF of 8" water main. Work includes connections to existing water mains, installation of new service lines to existing water meters, abandonment of existing water lines and valves, installation of gate valves and fire hydrant assemblies, restrained joint fittings and air release valves, removal and replacement of asphalt roadway, asphalt driveways, and concrete sidewalks, and all other necessary appurtenances
CountyOH
Posted
Aug 20, 2026
Sep 10, 2026
Work includes waterline replacement. Approx. 300 LF of 4" PVC water main, two gate valves, one hydrant, one connection to existing water main and eight water services reconnections.