Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work of the project includes removing the existing membrane, the installation of a nominal 50-mil fibertite mechanically fastened single-ply membrane roofing system, a min. 1/4" thick cover board, Polyisocyanurate insulation to create grade, and the required attachments to furnish a 20-year warranty on an existing 20,000 SF roof. All existing Polyisocyanurate insulation is intended to be reused, but work will also include evaluating the existing Polyisocyanurate insulation to identify any areas where its condition may make it unsuitable for reuse. If any damaged, deteriorated, wet, or inadequate insulation is found, the engineer should be notified immediately to determine whether it should be removed and replaced. Engineer anticipates that up to approx. 10% of the insulation may need to be replaced.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Romeo Community Schools is soliciting proposals for construction of an auxiliary gym at Romeo High School (62300 Jewell Rd, Washington, MI) to include site preparation, foundation, structural framing, roofing, electrical, plumbing and finishing. A mandatory pre-bid conference and site tour is scheduled for 2026-01-14 and bidding documents are distributed through BuildingConnected (or the buyer’s bid distribution channel); Barton Malow Builders is identified as the construction manager overseeing the project. Bids are due Jan 27, 2026 at 1:00 PM local time and the estimated value range is approximately $1,000,000–$5,000,000 (estimate).
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Romeo Community Schools is soliciting proposals for construction of an auxiliary gym at Romeo High School (62300 Jewell Rd, Washington, MI) to include site preparation, foundation, structural framing, roofing, electrical, plumbing and finishing. A mandatory pre-bid conference and site tour is scheduled for 2026-01-14 and bidding documents are distributed through BuildingConnected (or the buyer’s bid distribution channel); Barton Malow Builders is identified as the construction manager overseeing the project. Bids are due Jan 27, 2026 at 1:00 PM local time and the estimated value range is approximately $1,000,000–$5,000,000 (estimate).
Close: Jan 30, 2026
Roof replacement.
Floor Replacement for Main Gym.
Posted Date
Jan 16, 2026
Due Date
Feb 18, 2026
Release: Jan 16, 2026
Close: Feb 18, 2026
Floor Replacement for Main Gym.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis