Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project generally consists of the following primary components: demolition of existing lift station, installation of new sewer lift station via open cut and sewer piping, remove and dispose of existing 8" sewer pipe, 1 EA of abandon existing valve vault in place, 1 EA of connect to existing manhole, 40 LF of furnish & install 8" PVC SS, 24 LF of furnish & install 4" PVC SS, furnish & install lift station wet well, valve vault, and appurtenances, and associated work as shown on the plans.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
To perform a thorough and comprehensive cleaning of the master lift station #31 wet well, and to execute a necessary concrete support repair on one of the stations pumps.
Posted Date
Jan 10, 2026
Due Date
Feb 12, 2026
Release: Jan 10, 2026
Close: Feb 12, 2026
To perform a thorough and comprehensive cleaning of the master lift station #31 wet well, and to execute a necessary concrete support repair on one of the stations pumps.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Healthguard uvc pass through window: Custom made-to-fit each existing unique SPS pass through window; Typically replaces existing pass through window.; Electronic compartment mounted; below unit on "clean side"; Requires 110v / 15amp connection; Lamps: 6 to 8 Teflon® encapsulated UV-C lamps emitting 254nm wavelength; Two (opposing) LightSafe™ hinged doors with ViewSafe™ window; hinged as per specified; Patented mirror polished aluminum interior and interior courtesy light; Includes Two Removable Shelves; Replacement Lamps; UVC Indicator Strips - 60 second cycle for 99+% microbial disinfection which can be monitored with an indicator strip (at 254nm); Polish and Cloths; Onsite Training; Installation provided; One-year Warranty. See attached file.
Posted Date
Jan 21, 2026
Due Date
Feb 2, 2026
Release: Jan 21, 2026
Close: Feb 2, 2026
Healthguard uvc pass through window: Custom made-to-fit each existing unique SPS pass through window; Typically replaces existing pass through window.; Electronic compartment mounted; below unit on "clean side"; Requires 110v / 15amp connection; Lamps: 6 to 8 Teflon® encapsulated UV-C lamps emitting 254nm wavelength; Two (opposing) LightSafe™ hinged doors with ViewSafe™ window; hinged as per specified; Patented mirror polished aluminum interior and interior courtesy light; Includes Two Removable Shelves; Replacement Lamps; UVC Indicator Strips - 60 second cycle for 99+% microbial disinfection which can be monitored with an indicator strip (at 254nm); Polish and Cloths; Onsite Training; Installation provided; One-year Warranty. See attached file.
Available2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
Posted Date
Jan 4, 2026
Due Date
Feb 5, 2026
Release: Jan 4, 2026
Close: Feb 5, 2026
2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
AvailableRelease: Jan 29, 2026
Close: Feb 13, 2026
Filter, low Pass, NSN 5915995137648, Qty 14.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →