Pain points mentioned in board meetings and strategic plans
✓
Instantly outline and draft all requirements
✓
Bring in your USPs and exploit competitor gaps
Win These Opportunities Next
Starbridge can help you:
✓
Get ahead of RFPs — target accounts planning budget or ending contracts soon
✓
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
✓
Starbridge.ai books 30 - 40% of leads into meetings
Files
Contacts & Company Data
Premium
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
Competitor Intelligence
Premium
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Get a Free RFP Download
Potable Water Tank Inspection, Santa Rosa Lake and Dam Project Office - U.S. Army Engineer District Albuquerque Bid & RFP - Due Mar 20, 2026 | Starbridge
RFPs/Potable Water Tank Inspection, Santa Rosa Lake and Dam …
RFP⚡ Closing Soon
Potable Water Tank Inspection, Santa Rosa Lake and Dam Project Office
The U.S. Army Corps of Engineers (USACE), Albuquerque District, issued Solicitation W912PP26QA011 for routine inspections and cleanings of four potable water storage tanks at the Santa Rosa Lake and Dam Project Office. Inspections will use a Remotely Operated Vehicle (ROV) while tanks remain full and in-service, including exterior and interior evaluations with video documentation and a written report. The contract is set aside for Small Business under NAICS 221310 and has a performance period of 180 days from award.
What to Include In Your Proposal
Starbridge can help you:
✓
Pain points mentioned in board meetings and strategic plans
✓
Instantly outline and draft all requirements
✓
Bring in your USPs and exploit competitor gaps
Win These Opportunities Next
Starbridge can help you:
✓
Get ahead of RFPs — target accounts planning budget or ending contracts soon
✓
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
✓
Starbridge.ai books 30 - 40% of leads into meetings
Potable water cleaning and inspection project generally consists of, but is not limited to, interior cleaning of City of Fairfield above ground steel reservoirs, treatment plant facilities, and high lift pump station sump. The work also includes removing and disposing of any debris, sediment, or sludge, performing interior inspection and documentation of all surfaces (roof, walls, floor, hatches, man ways, etc.) and appurtenances (piping, support columns, ladder, cathodic protection, monitoring equipment, etc.), providing written repair recommendations for distressed areas (if any), minor spot repairs, de-cholrination and filtration of cleaning discharge, installation of flow meter on discharge, de-chlorination sampling, maintain reservoir quality (disinfection) at all times, and other items of work.
A Colorado agency is soliciting vendors to perform inspection and cleaning of potable water storage tanks. The scope involves professional services to clean and inspect drinking water storage facilities to help maintain safety and regulatory compliance. Proposals are due March 13, 2026 at 2:00 PM MDT via the Rocky Mountain E‑Purchasing System (BidNet Direct).
A Colorado agency is soliciting vendors to perform inspection and cleaning of potable water storage tanks. The scope involves professional services to clean and inspect drinking water storage facilities to help maintain safety and regulatory compliance. Proposals are due March 13, 2026 at 2:00 PM MDT via the Rocky Mountain E‑Purchasing System (BidNet Direct).
Available
Win Opportunities Before the RFP
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
Potable water cleaning and inspection project generally consists of, but is not limited to, interior cleaning of City of Fairfield above ground steel reservoirs, treatment plant facilities, and high lift pump station sump. The work also includes removing and disposing of any debris, sediment, or sludge, performing interior inspection and documentation of all surfaces (roof, walls, floor, hatches, man ways, etc.) and appurtenances (piping, support columns, ladder, cathodic protection, monitoring equipment, etc.), providing written repair recommendations for distressed areas (if any), minor spot repairs, de-cholrination and filtration of cleaning discharge, installation of flow meter on discharge, de-chlorination sampling, maintain reservoir quality (disinfection) at all times, and other items of work.