Summary
The work, in general, will include the approximate quantities & items listed as: Cut-Off Road - Approx. 4,000 FT (20' pavement). 1 LS Pulverize & Relay Base; 1,000 Ton Place: Approx. 2"/avg - 3/4" CABC as Needed after Pulverization; Regrade, Compact & Fine Grade to a 2% Slope Off Center Line; 2,000 Ton HMA: Place: 2" 3LT/Lower & 1 3/4" 4LT/Upper in Two Lifts; 400 Ton Place 2' Shoulder 3/4" CABC; 300 LF ditching; 90 LF of 15" - 18" CMP culvert with endwalls. Mulroy Road - Approx. 1,600 FT (20' pavement). 1 LS Pulverize & Relay Base; 400 Ton Place: Approx. 2"/avg - 3/4" CABC as Needed after Pulverization; Regrade, Compact & Fine Grade to a 2% Slope Off Center Line; 800 Ton HMA: Place: 2" 3LT/Lower & 1 3/4"
4LT/Upper in Two Lifts; 160 Ton Place 2 Foot Shoulder 3/4" CABC; 60 LF of 15" - 18" CMP Culvert with Endwalls. Frances Lane - Approx. 2,500 FT (21' pavement). 1 LS Pulverize & Relay Base; 650 Ton Place: Approx. 2"/avg - 3/4" CABC as Needed after Pulverization; Regrade, Compact & Fine Grade to a 2% Slope Off Center Line; 1,350 Ton HMA: Place: 2" 3LT/Lower & 1 3/4" 4LT/Upper in Two Lifts; 250 Ton Place 2 Foot Shoulder 3/4" CABC; 60 LF of 15" - 18" CMP Culvert with Endwalls.