FY26 Willapa Harbor Maintenance Dredging
Harbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
Description: This solicitation seeks contractors to perform maintenance dredging of the Port Fourchon Navigation Channel in Lafourche Parish, LA, including removal and satisfactory disposal of dredged material to the gulf beach west of the west jetty and/or east of the east jetty. The procurement is full & open under NAICS 237990 with an estimated magnitude of construction between $10,000,000 and $25,000,000. The solicitation (W912P8-26-BA-040) was posted on 2026-04-07 and bids are due by 2028-04-07.
Federal · LA, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
Oct 17, 2025
Closes
Nov 5, 2028
Harbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
Aug 28, 2026
Closes
Sep 15, 2026
The U.S. Army Corps of Engineers, Galveston District is seeking a contractor for maintenance dredging of the Gulf Intracoastal Waterway from High Island to Causeway and Channel to Port Bolivar, Texas, to address shoaling and maintain navigability. Base work covers approximately 959,000 cubic yards, with five options involving additional dredging and beneficial-use placement at the Joycelyn Nungaray placement area; completion is 270 calendar days after the Notice to Proceed, plus applicable option durations. This is an active, full-and-open federal construction presolicitation requiring performance and payment bonds and SAM registration, not a grant program.
Jan 7, 2026
Closes
Sep 15, 2026
Perform maintenance dredging and to address shoaling within tributary channels. All material from this project will be placed within nearby placement areas along the GIWW. Requirement consists of A Total Schedule No. 1 and Three (3) Options, if exercised.
Aug 10, 2026
Closes
Sep 10, 2026
Dredging of the ship channel generally between sims bayou and all the way to, and including, the upper turning basin area. Options for dredging docks will be included. Material will go to rosa allen placement area.