Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes police district four parking deck topping slab replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The parking deck is an existing precast concrete structure constructed in the early 2000s. The structural system consists of precast double tees, shear walls, single trusses, and concrete members containing pre-stressed cables. The parking deck is six stories in height and includes approximately 223,632 SF, with the top level containing a pool, spa, gym, and tennis court.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
The parking deck is an existing precast concrete structure constructed in the early 2000s. The structural system consists of precast double tees, shear walls, single trusses, and concrete members containing pre-stressed cables. The parking deck is six stories in height and includes approximately 223,632 SF, with the top level containing a pool, spa, gym, and tennis court.
Premium
Access the largest public sector contact database
Demolition of existing parking garage structure, flat lot, and associated building components, Construction/erection of new precast parking garage structure .
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
Demolition of existing parking garage structure, flat lot, and associated building components, Construction/erection of new precast parking garage structure .
AvailableThe Georgia Department of Transportation (GDOT) is soliciting bids from contractors prequalified for landscape project services to perform PCC slab replacement work (including removal and installation of concrete slabs, traffic control, cleanup, and compliance with GDOT specifications). Only contractors deemed Qualified through GDOT’s routine maintenance prequalification are eligible to respond. The solicitation is an RFQ/ITB with a period of performance requiring work to start within 30 days after the mandatory prework meeting and be completed within 365 days.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
The Georgia Department of Transportation (GDOT) is soliciting bids from contractors prequalified for landscape project services to perform PCC slab replacement work (including removal and installation of concrete slabs, traffic control, cleanup, and compliance with GDOT specifications). Only contractors deemed Qualified through GDOT’s routine maintenance prequalification are eligible to respond. The solicitation is an RFQ/ITB with a period of performance requiring work to start within 30 days after the mandatory prework meeting and be completed within 365 days.
AvailableBridge deck replacement.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Bridge deck replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis