Jul 23, 2026
Closes
Aug 12, 2026
2026 Paving Project
The installation of 12 ADA curb ramps, full width surface milling and overlay of approx. 3,500 LF total of pavement, including leveling course and base repair, as needed. Additionally, PennDOT approved paving membrane fabric will be installed along Road/Drive.