CityFL
Posted
Oct 21, 2026
Nov 20, 2026
Athletic Field Sod Material & Installation RFP
Athletic Field Sod Material & Installation.
Description: Project consists of playgrounds and athletic field. Work includes #1 sitework & site demolition (l&m); #2 concrete & paving (l&m); #3 sod and irrigation (m); #4 fencing (l&m); #5 modular sports futsal court (l&m); #6 electrical (l&m).
SchoolDistrict · OK, US
Adjacent opportunities open for bidding right now.
CityFL
Posted
Oct 21, 2026
Nov 20, 2026
Athletic Field Sod Material & Installation.
CityVA
Posted
Oct 29, 2026
Nov 12, 2026
The City of Newport News is seeking quotes for demolition of athletic-field lighting systems at two athletic fields. The work is at Sedgefield Elementary School and Riverside Elementary School. The contractor must remove and legally dispose of debris and clear, grade, and seed areas disturbed by the work.
CityCA
Posted
-
Nov 17, 2026
Enovation of the existing softball field at hauke park. Project improvements generally include replacement of two dugouts, the existing backstop, fencing, and aluminum bleachers; construction of a new bullpen; installation of a prefabricated tuff shed; rehabilitation of the existing decomposed granite pathway; and adjustment of utility frames and covers to finished grade. The work also includes, but is not limited to, demolition, excavation, site preparation, grading, and removal and disposal of excess and unsuitable materials at an off-site location
CityMA
Posted
Oct 21, 2026
Nov 10, 2026
Construction of a turf athletic field Milton High School.
Decision makers connected to this RFP from Western Heights School District I-41.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval