Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Metropolitan Utilities District is soliciting proposals from qualified architectural/engineering firms to provide comprehensive design services for the Platte West Water Production Facility - Wellfield Generator Improvements project. The scope includes all normal design services to upgrade the wellfield generator systems, with background files such as site plans and geotechnical reports available upon request. Proposals require a priced submission with firm qualifications, including a PDF via email and five hard copies with cost information in a separate sealed envelope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes construction of a new 750,000 gpd water production facility at the city's existing elevated water storage tank, included in this work will be the installation of all necessary piping, treatment equipment and housing, concrete, electrical improvements, and appurtenant work as required to make functional this new water production facility.
Posted Date
Jan 22, 2026
Due Date
Feb 23, 2026
Release: Jan 22, 2026
Close: Feb 23, 2026
Work includes construction of a new 750,000 gpd water production facility at the city's existing elevated water storage tank, included in this work will be the installation of all necessary piping, treatment equipment and housing, concrete, electrical improvements, and appurtenant work as required to make functional this new water production facility.
AvailableProvide AREA III Wellfield 500 KW Diesel Generator Replacement.
Posted Date
Jan 29, 2026
Due Date
Mar 4, 2026
Release: Jan 29, 2026
Close: Mar 4, 2026
Provide AREA III Wellfield 500 KW Diesel Generator Replacement.
AvailableTo replace the pumps and motors, main disconnect switch; and ancillary power equipment and associated load panels for fifteen (15) of the morris bridge wellfield pumps and motors. In addition, new over-current protection devices will be added to reduce the arc flash hazard.
Posted Date
Nov 25, 2025
Due Date
Feb 18, 2026
Release: Nov 25, 2025
Close: Feb 18, 2026
To replace the pumps and motors, main disconnect switch; and ancillary power equipment and associated load panels for fifteen (15) of the morris bridge wellfield pumps and motors. In addition, new over-current protection devices will be added to reduce the arc flash hazard.
AvailableWork includes water treatment facility improvements (phase 2).
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Work includes water treatment facility improvements (phase 2).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis