Womelsdorf-Robesonia Joint (Water) Authority
Special DistrictPA
Posted
Oct 2, 2026
Oct 21, 2026
Description: Work inlcudes plant c tank painting.
City · MS, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Petal.
Adjacent opportunities open for bidding right now.
Womelsdorf-Robesonia Joint (Water) Authority
Special DistrictPA
Posted
Oct 2, 2026
Oct 21, 2026
Painting the interior and exterior of the existing welded steel ground water storage tank called Furnace Tank. The tank is 68-feet in diameter and 56-feet in height. The work also includes foundation joint and crack repair, and incidental weld repairs. A third-party paint inspector has been retained for the painting system, and work is required to be coordinated with the awarded contractor of Contract 26-1 Furnace Creek Tank Metals.
Higher EducationNC
Posted
Oct 7, 2026
Oct 22, 2026
This is construction work for Phase 3 of East Carolina University’s Main Campus Steam Plant fuel tank farm service road, tank, and pump project. The solicitation overview also identifies proprietary irrigation-system and lighting installations. The university’s public notice lists Rain Bird as the irrigation-system preferred brand and specifies Leotek Arieta 18 N-Series light fixtures and Commscope cabling.
CityIL
Posted
Oct 8, 2026
Nov 19, 2026
Replace and relocate the motor control center for the high service pumps at the water treatment plant. Replace and relocate the main distribution panel at the water treatment plant. water treatment plant pre-filter detention tank rehabilitation install temporary detention tank(s) with high service pumps, piping, and pre-chlorination system for bypassing the detention tank during rehabilitation. Pressure wash and clean the inside of the tank, repair the cracks in the concrete walls and floor, apply an nsf approved waterproof coating on the concrete walls, floor, and ceiling on the inside of the tank, and paint all piping/fittings in the tank. Paint all walls, floor, ceiling, piping/valves/fittings in the high service pump valve vault that is connected to the detention tank.
CityME
Posted
Oct 8, 2026
Oct 20, 2026
Work includes carpentry & painting.