Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacing approx. 6,800 LF of existing 8" and 12" dia., 1950s vintage cast-Iron pipe with 6,800 LF of 8" and 12" dia. PVC pipe.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of Rural Water System Project – RW1A Pipeline.
Posted Date
Nov 5, 2025
Due Date
Feb 25, 2026
Release: Nov 5, 2025
Close: Feb 25, 2026
Construction of Rural Water System Project – RW1A Pipeline.
AvailablePremium
Access the largest public sector contact database
The Weber Basin Water Conservancy District is requesting Statements of Qualification from professional engineering firms for the Davis Aqueduct Parallel Pipeline Reach 2 Project. The scope includes planning, conceptual design, final design, and bidding services for an overflow pipe to North Fork Kays Creek and a pipeline connection to the existing Davis Aqueduct.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
The Weber Basin Water Conservancy District is requesting Statements of Qualification from professional engineering firms for the Davis Aqueduct Parallel Pipeline Reach 2 Project. The scope includes planning, conceptual design, final design, and bidding services for an overflow pipe to North Fork Kays Creek and a pipeline connection to the existing Davis Aqueduct.
AvailableA sustainable leadership pipeline to strengthen school leadership and improve student outcomes.
Posted Date
Nov 17, 2025
Due Date
Dec 19, 2025
Release: Nov 17, 2025
Close: Dec 19, 2025
A sustainable leadership pipeline to strengthen school leadership and improve student outcomes.
AvailableWork consists of installing approx 10,000 lf of sewer force main pipe. Installation of approx 10,000 lf of 20" pipe and appurtenances within county right-of-way and private roadways and within district easements. Temporary installation of a bypass pipeline to manage force main flows during construction within a 10-foot-wide easement. Replacement of an 8" waterline in the same 10-foot-wide easement and verifying that installation meets the requirements of the division of drinking water waiver.
Posted Date
Nov 5, 2025
Due Date
Dec 19, 2025
Release: Nov 5, 2025
Close: Dec 19, 2025
Work consists of installing approx 10,000 lf of sewer force main pipe. Installation of approx 10,000 lf of 20" pipe and appurtenances within county right-of-way and private roadways and within district easements. Temporary installation of a bypass pipeline to manage force main flows during construction within a 10-foot-wide easement. Replacement of an 8" waterline in the same 10-foot-wide easement and verifying that installation meets the requirements of the division of drinking water waiver.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis