Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Weber Basin Water Conservancy District
Weber Basin Water Conservancy District is requesting contractor Statements of Qualifications for the AV Watkins Siphon Replacement Project, Phase 2 – Direct Outlet Pipeline. The scope includes approximately 1,540 feet of 48-inch HDPE pipeline, along with vaults and associated piping. The notice is active from February 11, 2026 through March 4, 2026 and constitutes a construction-related solicitation, not a grant.
Posted Date
Feb 11, 2026
Due Date
Mar 4, 2026
Release: Feb 11, 2026
Weber Basin Water Conservancy District
Close: Mar 4, 2026
Weber Basin Water Conservancy District is requesting contractor Statements of Qualifications for the AV Watkins Siphon Replacement Project, Phase 2 – Direct Outlet Pipeline. The scope includes approximately 1,540 feet of 48-inch HDPE pipeline, along with vaults and associated piping. The notice is active from February 11, 2026 through March 4, 2026 and constitutes a construction-related solicitation, not a grant.
AvailableWeber Basin Water Conservancy District
The project generally includes approx 4,250 FT of 42" HDPE DR32.5 pipe installed by open trench; 1,054 SY of 2" temporary asphalt pavement; 320 TON of HMA; 541 LF of concrete curb and gutter; 158 SF of concerete side walk. See outside link.
Posted Date
Jan 6, 2026
Due Date
Jan 22, 2026
Release: Jan 6, 2026
Weber Basin Water Conservancy District
Close: Jan 22, 2026
The project generally includes approx 4,250 FT of 42" HDPE DR32.5 pipe installed by open trench; 1,054 SY of 2" temporary asphalt pavement; 320 TON of HMA; 541 LF of concrete curb and gutter; 158 SF of concerete side walk. See outside link.
Weber Basin Water Conservancy District
The Weber Basin Water Conservancy District is requesting Statements of Qualification from professional engineering firms for the Davis Aqueduct Parallel Pipeline Reach 2 Project. The scope includes planning, conceptual design, final design, and bidding services for an overflow pipe to North Fork Kays Creek and a pipeline connection to the existing Davis Aqueduct.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Weber Basin Water Conservancy District
Close: Dec 18, 2025
The Weber Basin Water Conservancy District is requesting Statements of Qualification from professional engineering firms for the Davis Aqueduct Parallel Pipeline Reach 2 Project. The scope includes planning, conceptual design, final design, and bidding services for an overflow pipe to North Fork Kays Creek and a pipeline connection to the existing Davis Aqueduct.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Weber Basin Water Conservancy District
The meeting agenda covered several critical items, including the approval of the October 2025 financial report. Discussions focused heavily on water contract actions, specifically the cancellation of water for Phillip D & Brecken R Taylor in Davis County, and the approval of water transfers for Farmington City within Davis County. Additionally, replacement water contracts were approved for Highlands Water Company in Morgan County, covering allocations for new developments. Key project considerations involved awarding the Secondary Large Meter Project contract to Smooth Stone Construction, approving the pre-purchase of 42" HDPE pipe for the Layton Canal Piping Project from Core and Main due to long lead times, and approving the purchase of Sensus Cordonel meters. The board also approved the purchase of a new Volvo Excavator and a Peterbilt 567 Dump Truck as part of fleet replacement efforts. A significant portion of the meeting was dedicated to approving the execution of an agreement with HDR for the Tiered Water Rate Structure Study, necessitated by state legislation requiring tiered conservation rate billing by 2030. The General Manager provided updates on the Willard Bay project progress and introduced the three newly confirmed board members whose service will begin in February 2026. The session concluded with a closed session to discuss water purchase, possible litigation, and property purchase.
The meeting included discussions and actions on various water-related contracts, financial reports, and project approvals. Water cancellations and transfers were considered, along with new treated and untreated water contracts. A water supply report was presented, and contractor selections were approved for waterline relocation projects. The board also discussed and approved an addendum to the Hillfield Vault MOU and a power purchase agreement for the Fremont Solar and Battery project. The board also discussed strategic and legislative communication service agreement. The meeting also included discussion of employee benefits package.
The meeting included recognition of retiring employees, updates from the Finance Department, and a water supply report. The board considered interlocal agreements with the Reinvestment Agency of Weber County and the Redevelopment Agency of South Weber City. They also discussed and approved cancellations of water contracts. Additionally, the board considered and approved the construction contract for the Highway 224 Interconnect Pipeline Project and an amended interlocal agreement with Layton City. Project updates were presented, including the Davis Aqueduct Reach 1, Gateway Canal Landslide Stabilization, and the Weber South WTP 5.0 MG Water Tank Project. Power needs in western Weber County were also reviewed.
This Drought Contingency Plan for the Weber Basin Water Conservancy District serves as a roadmap to manage water shortages and minimize their impacts. The plan outlines five key goals: evaluating drought risks and vulnerabilities, establishing drought levels and monitoring processes, identifying mitigation measures, preparing response actions, and developing a framework for continuous implementation, evaluation, and updates. The overarching aim is to enhance drought resiliency within the District, ensure organized and cost-efficient management of emergency supply conditions, and reduce risks to public health, agriculture, industry, and the environment from water shortages.
This document outlines a comprehensive water conservation plan for the Weber Basin Water Conservancy District. It aims to support state water use goals, secure a reliable water supply, manage infrastructure costs, meet community expectations, and minimize environmental impacts. The plan focuses on three primary conservation objectives: supporting customer agencies, demonstrating outdoor water conservation effectiveness, and encouraging public efforts through education and incentives. It details a selected program (Program B) involving moderate improvements and increased investment, with measures spanning education, metering, incentives, and policy development, particularly emphasizing the reduction of outdoor water use. The plan seeks to ensure water availability for a growing population through 2060, balance conservation with new supply development, and achieve significant water savings to meet long-term regional goals.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Weber Basin Water Conservancy District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Weber Basin Water Conservancy District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database