Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of installing approx 10,000 lf of sewer force main pipe. Installation of approx 10,000 lf of 20" pipe and appurtenances within county right-of-way and private roadways and within district easements. Temporary installation of a bypass pipeline to manage force main flows during construction within a 10-foot-wide easement. Replacement of an 8" waterline in the same 10-foot-wide easement and verifying that installation meets the requirements of the division of drinking water waiver.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide construction engineering services for the district's strolling hills pipeline replacement project.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Close: Dec 18, 2025
Provide construction engineering services for the district's strolling hills pipeline replacement project.
AvailableProvide construction management and inspection professional services.
Posted Date
Nov 6, 2025
Due Date
Dec 17, 2025
Release: Nov 6, 2025
Close: Dec 17, 2025
Provide construction management and inspection professional services.
AvailableWork consists of refurbish, rehabilitate, or replace approx 3. 5 of the 12 miles of prestressed concrete cylinder pipe to address various stages of degradation. The replacement method will be relining using split-can steel pipe sections.
Posted Date
Sep 10, 2025
Due Date
Dec 17, 2025
Release: Sep 10, 2025
Close: Dec 17, 2025
Work consists of refurbish, rehabilitate, or replace approx 3. 5 of the 12 miles of prestressed concrete cylinder pipe to address various stages of degradation. The replacement method will be relining using split-can steel pipe sections.
AvailableConstruction of Rural Water System Project – RW1A Pipeline.
Posted Date
Nov 5, 2025
Due Date
Feb 25, 2026
Release: Nov 5, 2025
Close: Feb 25, 2026
Construction of Rural Water System Project – RW1A Pipeline.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis