Summary
The project consists of approx 8,800 LF of pavement joint adhesive; 4,115 LF of sawed bituminous pavement; 3,550 LF of reclaimed asphalt pavement temporary trench patch; 3,240 LF of 15" pe pipe (type s); 1,500 LF of reset granite curb; 890 CY of common excavation; 825 TON of hbp-3/4" binder mix, machine method; 730 SY of turf establishment with mulch, tackifiers and loam; 670 LF of cold planing bituminous surfaces, 18" wide x 1" deep; 550 TON of hbp-1/2" surface mix, machine method; 375 LF of straight granite curb; 335 LF of copper service pipe; 270 CY of crushed gravel for shimming; 230 SY of cold planing bituminous surfaces; 200 LF of sewer pipe.