Summary
Work consist of 175 sy of asphalt pavement removal, 400 sy of concrete pavement removal, 880 lf of curb & gutter removal, 150 sy of sidewalk removal, 220 lf of 4" lateral adjustment, 35 lf of 6" lateral adjustment, 60 lf of 8" lateral adjustment, 175 sy of existing asphalt pavement repair, 70 lf of 18" circular storm pipe, 480 lf of 42" circular storm pipe, 430 lf of 48" circular storm pipe, 210 lf of 53"x34" elliptical storm pipe, 880 lf of portland cement concrete curb and gutter, 3200 sf of concrete sidewalk, 880 sf of concrete curb ramp, 4000 sf of concrete driveway, 120 sf of detectable warning surface.