Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Phase 8b geosynthetics supply and installation including but not lim- ited to: mobilization, furnishing and transporting 60-mil hdpe tex- tured geomembrane, 8-oz/sy non- woven cushion geotextile, and all related work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes mobilization, site preparation, dewatering, surveying services, furnishing and installing temporary erosion and sedimentation control structures, mass excavation, structural fill, subgrade preparation, compacted soil liner construction, drainage layer installation, protective cover installation, excavation and backfilling of anchor trenches, temporary haul roads, demobilization, and all related work and incidentals.
Posted Date
Jan 1, 2026
Due Date
Jan 23, 2026
Release: Jan 1, 2026
Close: Jan 23, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes mobilization, site preparation, dewatering, surveying services, furnishing and installing temporary erosion and sedimentation control structures, mass excavation, structural fill, subgrade preparation, compacted soil liner construction, drainage layer installation, protective cover installation, excavation and backfilling of anchor trenches, temporary haul roads, demobilization, and all related work and incidentals.
Supply and installation of a new standby diesal generator system. This project includes retiring the existing generator in place, replacing the existing automatic transfer switch, and installing a new generator on a poured concrete pad located in the designated alcove near the radio tower.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Supply and installation of a new standby diesal generator system. This project includes retiring the existing generator in place, replacing the existing automatic transfer switch, and installing a new generator on a poured concrete pad located in the designated alcove near the radio tower.
AvailableSite survey, concept planning, detailed design, permitting, and supply and installation/construction.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Site survey, concept planning, detailed design, permitting, and supply and installation/construction.
AvailableDesign, supply, and installation of playground site improvements at Carroll Park.
Posted Date
-
Due Date
Jan 14, 2026
Release: -
Close: Jan 14, 2026
Design, supply, and installation of playground site improvements at Carroll Park.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →