Retrieving RFP details
Release
Close
Las Gallinas Valley Sanitary Dist
The phase 3: superstructure (multipurpose laboratory building) project is the final phase of a three-phase project consisting of a two-story building elevated on a raised level 1 structural deck.
Pre-bid Meeting Sign-in Sheet - Phase 3 Superstructure (Multipurpose Laboratory Building)
City of Crystal Lake
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
University Of North Dakota
Povide scheduling software to support the Phase 2 (Clerkship) and Phase 3 (Elective) MD student lottery at the School of Medicine & Health Sciences..
Release
Sep 26, 2025
Close
Nov 20, 2025