Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Houlton
Work includes approx 6,100 Lf 12" DI water main; 6 EA hydrant assembly; 1 LS tree clearing; 1 EA 2" CTS water services. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Bellevue
Construct approx. 8,160 LF of ductile iron water mains and appurtenances, Install two (2) PRV Vault and Appurtenances, Install new fire hydrant assemblies, Install replacement water services, Relocate existing utilities (as required), Abandon asbestos cement pipe, Restore surface conditions, including asphalt trench patching, concrete curbs, gutters and sidewalks, Perform Traffic control, Other work as required to complete the project.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
City of Bellevue
Close: Dec 18, 2025
Construct approx. 8,160 LF of ductile iron water mains and appurtenances, Install two (2) PRV Vault and Appurtenances, Install new fire hydrant assemblies, Install replacement water services, Relocate existing utilities (as required), Abandon asbestos cement pipe, Restore surface conditions, including asphalt trench patching, concrete curbs, gutters and sidewalks, Perform Traffic control, Other work as required to complete the project.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Joliet
Work includes installation of approximately 6,836 linear feet of 4- inch to 16-inch water main and 305 linear feet of 8-inch sanitary sewer.
Posted Date
Nov 4, 2025
Due Date
Dec 2, 2025
Release: Nov 4, 2025
City of Joliet
Close: Dec 2, 2025
Work includes installation of approximately 6,836 linear feet of 4- inch to 16-inch water main and 305 linear feet of 8-inch sanitary sewer.
AvailableCity of Joliet
Work includes installation of approximately 6,675 linear feet of 6- inch to 8-inch water main.
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
City of Joliet
Close: Dec 11, 2025
Work includes installation of approximately 6,675 linear feet of 6- inch to 8-inch water main.
AvailableCity of Joliet
Work includes installation of approximately 12,580 linear feet of 6-inch to 12-inch water main.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
City of Joliet
Close: Dec 9, 2025
Work includes installation of approximately 12,580 linear feet of 6-inch to 12-inch water main.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →