Retrieving RFP details
Release
Close
Mannheim School District 83
Phase 2 School renovation. Bid package 2C - demolition, bid package 6A - general trades, bid package 9A - flooring, bid package 9C - painting.
Staunton Community Unit School District 6
Project consists of addition and renovation, phase 2. Work includes bid package no. 14 - general trades, bid package no. 29 - painting. This portion of the project will include casework, doors, resinous flooring, signage, lockers, gym flooring, athletic equipment, telescoping stands, and painting.
241-Network Contract Office 01 (36C241)
Requirement for laboratory casework for the renovation of the pathology and laboratory. The contractor shall: Coordinate and provide project management of all products and services to manage, verify design, order, ship, deliver and install new casework from the manufacturer until final acceptance by the Contracting Officer Representative (COR)/ VA Point of Contact. Contractor is required to have on site staff supervisor with OSHA 10 certification. Contractor is required to completely install all casework and associated components and accessories. See attached file.
University of Central Florida
This project calls for the Renovation/Remodel/Repair of an existing 1,800.00 SF Education/School/University.
Release
Oct 23, 2025
Close
Nov 10, 2025