CityMA
Posted
Nov 5, 2026
Dec 2, 2026
Guardrail Repair & Replacement / Dpw RFP
Guardrail Repair & Replacement.
Description: Replacement and repair of approximately 70 linear feet of 15-inch PVC sewer main, including sewer bypassing, trenching, backfilling, traffic control, and surface and street restoration.
SpecialDistrict · CA, US
Adjacent opportunities open for bidding right now.
CityMA
Posted
Nov 5, 2026
Dec 2, 2026
Guardrail Repair & Replacement.
California Department of Transportation
State AgencyCA
Posted
Nov 2, 2026
Dec 10, 2026
Project includes 770 CY roadway excavation; 13,200 SF dry seed; 13,200 SF rolled erosion control product; 90 TN hot mix asphalt; 250 SY place hot mix asphalt; 1,080 LF 24" corrugated steel pipe; 160 LF 36" corrugated steel pipe; 570 LF abandon culvert; 91 LF 18" cured-in-place pipeliner; 89 LF 24" cured-in-place pipeliner; 50 LF reconstruct guardrail. See attached file.
Canyon Independent School District
School DistrictTX
Posted
Nov 11, 2026
Dec 9, 2026
Provide asphalt repair and replacement on an as needed basis.
Canyon Independent School District
School DistrictTX
Posted
Nov 11, 2026
Dec 9, 2026
Provide concrete repair and replacement on an as needed basis.
Decision makers connected to this RFP from Edgemont Community Services District.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
621 days before RFP
The engineering report recorded recommendations for numerous mainline repairs/replacements, with preliminary mainline repair estimates of $7.63 million and project priorities to follow.
Engineering Sam reviewed the engineering report of February 25, 2025. He specifically noted that the review of the video inspections of the mainlines, laterals and manholes revealed recommendations for numerous repairs/replacements. The initial estimates indicate mainline repairs totaling $7.63M and lateral replacements totaling up to $11.84M. Manhole…
Edgemont Community Services District Meeting of the Board of Directors
Board meeting · Feb 27, 2025
Board meeting
453 days before RFP
The Board authorized Houston & Harris to perform a video inspection of a small section of 15-inch sewer main parallel to the Riverside County Flood Control channel.
Phase I CIP Project, video inspection of 15" sewer parallel to Riverside County flood Control channel -- approve estimate from Houston & Harris for $2,770 -- Sam recommends approval of the video inspection -- Brenda moved to authorize Houston & Harris to perform the video inspection of the small section of sewer mainline, Moses seconded, motion carried.
Board of Directors of the Edgemont Community Services District Meeting
Board meeting · Aug 14, 2025
Board meeting
166 days before RFP
The Board approved a $20,000 increase to the Phase 1 CIP Cottonwood Avenue Sewer design budget to incorporate Riverside County Flood Control requirements and City comments.
District projects Phase 1 CIP Cottonwood Avenue Sewer -- approve $20,000 increase in budget to incorporate Riverside County Flood Control requirements and City's comments -- Sinnaro requested the board approve the increase in the design budget by $20,000. Brenda moved to approve the increase in design budget for this project, Hillary seconded, motion…
Edgemont Community Services District Board Meeting Agenda
Board meeting · May 28, 2026
RFP published
Proposals due (16 days left)