Town of Southbury
Work includes 20 CY earth excavation; 2 CY rock excavation; 1 LS management of reusable and surplus soil; 50 SY removal of concrete sidewalk; 170 LF cut bituminous concrete pavement; 30 SY removal of bituminous sidewalk; 35 CY borrow; 8 ea sediment control system at catch basin; 580 LF sedimentation control system; 50 SY pavement repair; 40 LF concrete curbing; 80 LF bituminous concrete lip curbing; 3,500 SF concrete sidewalk; 2,000 SF concrete sidewalk ramp; 250 SF detectable warning surface. See attached file.
Southbury Pedestrian Safety Improvements - Project Manual
City of Columbus
Construction services for the pedestrian safety improvements - TRR sidewalk replacement (2025 tree root) project. This project involves repairs sidewalk damaged by City street tree roots by removing and replacing concrete, and other such work.
Township of West Windsor
Quantities include but are not limited to approx 4 UNITS Rectangular Rapid Flashing Beacons, 12 Units Warning Signs, 12 UNITS Warning Plaques, and other incidental construction including restoration.
Oklahoma Department of Transportation
Pedestrian and bike improvements.