Summary
The City of Sheridan (Southside Park, Sheridan, OR) seeks a contractor to install an owner-supplied 66,000 lb., 80-foot railcar pedestrian bridge, including unloading, setting the bridge on newly-constructed ultra-block abutments, and anchoring per project drawings. Work includes erosion and sediment control, site security, construction of ADA-compliant concrete ramps on both sides, installation of removable bollards, site cleanup and vegetation restoration, and must follow the project specifications and drawings. The solicitation calls for substantial completion within 60 calendar days and final completion within 90 calendar days from the notice to proceed; the bid opening is on July 16, 2026.