Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the repair of multiple pedestrian bridges, including but not limited to spot repairs, concrete patching, deck / railing replacement, and sealing of bridge.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pedestrian bridge repairs.
Posted Date
Oct 14, 2025
Due Date
Dec 12, 2025
Release: Oct 14, 2025
Close: Dec 12, 2025
Pedestrian bridge repairs.
Premium
Access the largest public sector contact database
The project consists of the removal of the existing pedestrian bridge and construction of a replacement pedestrian bridge.
Posted Date
Oct 1, 2025
Due Date
Dec 12, 2025
Release: Oct 1, 2025
Close: Dec 12, 2025
The project consists of the removal of the existing pedestrian bridge and construction of a replacement pedestrian bridge.
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
Close: Dec 12, 2025
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Work include 655 SY sealing concrete surfaces (epoxy urethane); 3 SF 1" preformed expansion joint filler; 319' railing, misc. : refurbished existing railing; 1,795 SF stone veneer; 768' polyurethane caulking for stone veneer; 688' concrete tunnel joint repair, as per plan; 3 CY class qc1 concrete, substructure; 186 SF patching concrete structure, as per plan; 648 SF patching concrete structures with trowelable mortar; 8 SF concrete patching with galvanic anode protection.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
Work include 655 SY sealing concrete surfaces (epoxy urethane); 3 SF 1" preformed expansion joint filler; 319' railing, misc. : refurbished existing railing; 1,795 SF stone veneer; 768' polyurethane caulking for stone veneer; 688' concrete tunnel joint repair, as per plan; 3 CY class qc1 concrete, substructure; 186 SF patching concrete structure, as per plan; 648 SF patching concrete structures with trowelable mortar; 8 SF concrete patching with galvanic anode protection.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis