Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include 655 SY sealing concrete surfaces (epoxy urethane); 3 SF 1" preformed expansion joint filler; 319' railing, misc. : refurbished existing railing; 1,795 SF stone veneer; 768' polyurethane caulking for stone veneer; 688' concrete tunnel joint repair, as per plan; 3 CY class qc1 concrete, substructure; 186 SF patching concrete structure, as per plan; 648 SF patching concrete structures with trowelable mortar; 8 SF concrete patching with galvanic anode protection.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include pedestrian tunnel repairs and waterproofing.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
Work include pedestrian tunnel repairs and waterproofing.
AvailablePremium
Access the largest public sector contact database
Work consists of the repair of multiple pedestrian bridges, including but not limited to spot repairs, concrete patching, deck / railing replacement, and sealing of bridge.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
Work consists of the repair of multiple pedestrian bridges, including but not limited to spot repairs, concrete patching, deck / railing replacement, and sealing of bridge.
Available2026 curb, gutter, sidewalk replacement and 2026 citywide accessible pedestrian ramp. Remove and replace existing damaged concrete sidewalks, driveways, curb and gutter, valley gutter, and wheelchair accessible curb ramps; remove roots; root prune trees; and install root barriers at various locations.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
2026 curb, gutter, sidewalk replacement and 2026 citywide accessible pedestrian ramp. Remove and replace existing damaged concrete sidewalks, driveways, curb and gutter, valley gutter, and wheelchair accessible curb ramps; remove roots; root prune trees; and install root barriers at various locations.
AvailableProvide Robertson tunnel Geotech monitoring and maintenance services,
Posted Date
Dec 1, 2025
Due Date
Jan 6, 2026
Release: Dec 1, 2025
Close: Jan 6, 2026
Provide Robertson tunnel Geotech monitoring and maintenance services,
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis