Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Warren
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of St. Paul Park
1 LS Remove Existing Bridge, Pilings and Logs. 1 LS Furnish and Install New Bridge System. 780 LF 8" Steel Piling 5 CY Excavation Channel and Pond 450 SF 6" 8" Concrete Walk. 120 LF Flotation Silt Curtain Type Moving Water. 1 LS Turf Establishment The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract.
Posted Date
Oct 23, 2025
Due Date
Nov 18, 2025
Release: Oct 23, 2025
City of St. Paul Park
Close: Nov 18, 2025
1 LS Remove Existing Bridge, Pilings and Logs. 1 LS Furnish and Install New Bridge System. 780 LF 8" Steel Piling 5 CY Excavation Channel and Pond 450 SF 6" 8" Concrete Walk. 120 LF Flotation Silt Curtain Type Moving Water. 1 LS Turf Establishment The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract.
City of Glasgow
The project consists of the removal of the existing pedestrian bridge and construction of a replacement pedestrian bridge.
Posted Date
Oct 1, 2025
Due Date
Dec 12, 2025
Release: Oct 1, 2025
City of Glasgow
Close: Dec 12, 2025
The project consists of the removal of the existing pedestrian bridge and construction of a replacement pedestrian bridge.
AvailableCity and County of Denver
Constructing a new single-span pedestrian bridge.
Posted Date
Oct 15, 2025
Due Date
Nov 25, 2025
Release: Oct 15, 2025
City and County of Denver
Close: Nov 25, 2025
Constructing a new single-span pedestrian bridge.
AvailableMahoning County
Pedestrian bridge improvement project.
Posted Date
Jul 15, 2025
Due Date
Nov 19, 2025
Release: Jul 15, 2025
Mahoning County
Close: Nov 19, 2025
Pedestrian bridge improvement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis