Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Mahoning County
Pedestrian bridge improvement project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Warren
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
City of Warren
Close: Dec 12, 2025
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
AvailableCity of Glasgow
The project consists of the removal of the existing pedestrian bridge and construction of a replacement pedestrian bridge.
Posted Date
Oct 1, 2025
Due Date
Dec 12, 2025
Release: Oct 1, 2025
City of Glasgow
Close: Dec 12, 2025
The project consists of the removal of the existing pedestrian bridge and construction of a replacement pedestrian bridge.
AvailableCity and County of Denver
Constructing a new single-span pedestrian bridge.
Posted Date
Oct 15, 2025
Due Date
Nov 25, 2025
Release: Oct 15, 2025
City and County of Denver
Close: Nov 25, 2025
Constructing a new single-span pedestrian bridge.
AvailableSan Francisco Public Works
The project will demolish nearly all existing park features and the street pedestrian bridge. The existing upperlevel restrooms and the parking garage below will remain in place. The plaza will be completed with new drainage and waterproofing, new paving, landscape planters, irrigation, decorative walls, stairs, curbs, railings, shade structures, playground structures, lighting, and electrical systems. Architectural work includes the construction of a clubhouse building and select retrofit of structural concrete. The existing hotel building at the east side of the pedestrian bridge as well as the parking garage below shall be occupied and used by the public during construction.
Posted Date
Mar 12, 2025
Due Date
Dec 10, 2025
Release: Mar 12, 2025
San Francisco Public Works
Close: Dec 10, 2025
The project will demolish nearly all existing park features and the street pedestrian bridge. The existing upperlevel restrooms and the parking garage below will remain in place. The plaza will be completed with new drainage and waterproofing, new paving, landscape planters, irrigation, decorative walls, stairs, curbs, railings, shade structures, playground structures, lighting, and electrical systems. Architectural work includes the construction of a clubhouse building and select retrofit of structural concrete. The existing hotel building at the east side of the pedestrian bridge as well as the parking garage below shall be occupied and used by the public during construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis