Closed

Pedestrian and Bike Facilities for Kinnickinnic River Trail Connections

Description: The general work requested is: 8" concrete pavement, 8" concrete pavement with integral curb, variable thickness asphalt, concrete curb and gutter, concrete walk, 7" concrete driveway, base aggregate, concrete traffic islands, roadway filling, catch basins, storm water drains, pavement removal, roadway cutting, curb and gutter removal, concrete sidewalk removal, sawcutting, catch basin abandonment, signage and pavement marking removal, epoxy and cold plastic pavement marking, lighting installation, and other site restoration, etc.

Buyer
City of Milwaukee

City · WI, US

Released
Jun 17, 2026
Closes
Aug 11, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts